The ex-works price is roughly half the story. Samples, tooling, artwork, testing, documents, freight, duty and receiving add a fixed block that does not shrink with order size — which is why a 1,000-unit run often lands at two to three times the unit price you were quoted.
Overview
This is the calculation we walk buyers through before they commit to a first run. It uses 2026 market ranges for a 60-count capsule SKU shipped from Guangdong to the US west coast, and the same structure applies to gummies, powders and liquids. The numbers are estimates, not a quote — freight and duty move, and your formula decides the ex-works price. What does not move is the shape of the curve: below about 2,000 units, the fixed block dominates, and past 5,000 units the unit cost starts behaving the way the sales deck promised.

Why the ex-works price is only half the number
Ex-works means the goods are yours when they leave the factory gate: before the container, before the duty, before anyone puts a label on your pallet in a warehouse. Buyers compare quotes as if the factory price were the cost, then discover that 1,000 bottles is three cubic metres, that LCL has a minimum charge, that the freight forwarder wants a customs bond, and that the 3PL charges by the pallet position whether the goods sell or not.
The correct comparison is landed cost per sellable unit: everything you paid, divided by units you can actually sell. That number is what your margin has to live on, and at low volumes it is dominated by costs that have nothing to do with the formula.
The fixed block: what does not scale down
Five costs hit a 1,000-unit order almost as hard as a 10,000-unit one. Samples: $0–$400 for standard formulas, more if a custom flavour or mould is involved. Tooling: $0 for a stock bottle, $800–$3,000 for a custom gummy mould or a shaped bottle. Artwork: $100–$600 for dielines, label files and a barcode check, more if you need a designer. Testing: $250–$900 for a third-party finished-product panel, plus $800–$2,000 if you want accelerated stability before launch. Documents: $100–$400 for a free-sale certificate, legalisation or a notarised GMP copy for your market.
Spread over 1,000 units that block adds $1.25–$4.30 per unit. Spread over 10,000 units the same block adds $0.13–$0.43. This single line explains most of the gap between what a factory quotes and what a first-time brand actually pays.
Freight: compare cubic metres, not cartons
A 60-count bottle carton holds 12–24 units, so 1,000 units is roughly 3 CBM and 300–500 kg. LCL pricing is per cubic metre with a minimum charge, so a part-load often costs nearly the same as a full pallet. Expect $90–$160 per CBM from Shenzhen to Los Angeles plus origin and destination charges, which lands a 3 CBM shipment around $300–$700 all in.
Air freight only makes sense for samples, launches and anything with a shelf life shorter than the ocean transit. Budget $4–$7 per kg to the US or EU, which for 400 kg is $1,600–$2,800 — more than the goods in many first orders. If you are quoted DDP, check what the forwarder has actually included: duty, import VAT, customs clearance and final delivery are frequently excluded from the headline rate.
Duty and tax: read the HTS code, not the forum post
Dietary supplements do not have one duty rate. The classification depends on the product form and the country's tariff schedule, and rates have moved repeatedly in the last two years. Ask your forwarder for the HTS or TARIC code they intend to use and check it yourself; a misclassified entry can be re-assessed later with penalties, which is a bad surprise eight months after launch.
In the US, most supplement classifications have historically landed at or near zero, but the 2025–2026 tariff changes mean you should confirm the current rate for your specific code and origin. In the EU, import VAT is charged at the destination country rate and is recoverable if you are VAT-registered. Neither of those is the factory's problem, which is why they are never in the factory's quote.
Worked example: 1,000 bottles of a 60-count capsule
Goods: 1,000 units at $1.60 ex-works = $1,600. Fixed block: sample $150, stock bottle so no tooling, artwork $250, third-party panel $400, free-sale certificate and GMP copy $200 = $1,000. Freight: 3 CBM LCL plus origin charges = $550. Duty: assume zero on this classification = $0. Insurance: $40. 3PL receiving and put-away: $180. Total = $3,370 landed, or $3.37 per bottle before you have spent a cent on ads.
The same order at 5,000 units: goods $7,000 at $1.40, fixed block still about $1,100 (a little testing scale-up, same artwork), freight $1,300 for 12 CBM, 3PL $320. Total $9,720, or $1.94 per unit. The fixed block fell from $1.00 to $0.22 per unit and freight per unit fell by two thirds. Nothing about the formula changed — only the denominator.
So what should a first order actually be?
If the goal is to prove a market, 1,000 units is the right size, and you should accept the high unit cost as a research budget rather than a production cost. If the goal is to make money on the first shipment, 1,000 units rarely works unless your retail price is high enough to carry a $3.37 cost — which in supplements usually means a premium positioning and a subscription model.
The practical middle path is 1,000 units on one hero SKU, then 5,000 on the same SKU once the first reorder signal appears. Do not split 1,000 units across four flavours: each SKU carries its own fixed block, and the testing, artwork and label costs multiply while the freight saving does not.
Four ways to ship a first order
LCL
Cheapest for 2–6 CBM. Slow, and you share a container with other cargo.
Full pallet or FCL
Better rate per CBM once you pass about 12 CBM or 8 pallets.
Air freight
For samples, launches or short shelf life. $4–$7 per kg, worth it only when timing is the product.
DDP by the forwarder
One invoice, less control. Confirm duty, VAT, clearance and last-mile are all inside the rate.
How to build your own number
- 01
Get an ex-works quote with the packaging specified
Bottle size, label type and carton count change the freight number more than the formula does.
- 02
List the fixed block separately
Samples, tooling, artwork, testing, documents. Divide by units to see what volume is really costing you.
- 03
Ask the forwarder for CBM and chargeable weight
Then price LCL and air side by side, including origin and destination charges.
- 04
Confirm the duty code
Get the HTS or TARIC code in writing and check the current rate yourself.
- 05
Add receiving and storage
3PL inbound, pallet positions and pick fees are part of landed cost, not overhead.
Why EUPHM
A real margin number
You price the product against landed cost, not against the factory quote, so the first reorder does not surprise you.
Fewer SKUs at launch
Seeing the fixed block per SKU is usually what convinces founders to launch one hero product instead of four.
A credible volume plan
You know the exact order size where unit cost drops, which is the number to aim the second purchase order at.
Questions buyers ask.
Is 1,000 units actually enough for a launch?+
For a single SKU sold online, yes — roughly three months of sales at 10–12 units a day. It is not enough to supply retail distribution, where buyers usually expect a case-ready pack and a reorder commitment.
Why is my landed cost double the quoted unit price?+
Almost always the fixed block: samples, artwork, testing, documents and the LCL minimum charge, all divided by a small unit count. At 5,000 units the same block adds a fraction per unit.
Should I use the factory's freight quote?+
Compare it with one independent forwarder. Factories often get good rates, but you want to see the origin and destination charges itemised so you can tell what is actually included.
How much does third-party testing add?+
A finished-product panel covering assay, microbials and heavy metals typically runs $250–$900. Accelerated stability adds $800–$2,000 and takes 3–6 months, so start it before you need it.
Do I need a customs bond in the US?+
For commercial imports, yes — a single-entry or continuous bond. Your forwarder or customs broker can arrange it; it is a fixed cost, not a per-unit cost.
What is the cheapest way to test a market?+
One SKU, 1,000 units, stock packaging, sea freight, and no custom mould. Spend the money on the product and the page, not on tooling you may not reuse.
Does a higher MOQ always lower the unit price?+
Usually, but not always below the freight step change. Ask for a quote at 1,000, 3,000, 5,000 and 10,000 units and look at landed cost per unit, not ex-works.
How long does the money stay tied up?+
Plan for 50% deposit at order, 50% before shipment, then 30–40 days of ocean transit and 1–2 weeks of receiving. From payment to sellable stock, eight to twelve weeks is realistic.
Xu Wei writes the manufacturing, quality and regulatory guides on EUPHM. He works directly with the plant's production and QA teams to document how each dosage form is made, tested and released, so every claim on the site can be traced back to a batch record or a certificate on file.
More guides in this category.
See all →
How to Negotiate a Supplement MOQ (Without Lying to Your Supplier)
A minimum order is not a sales tactic — it is the point where a factory stops losing money on setup, cleaning, yield loss and QC. Negotiate the components, not the number, and 1,000 units can often become 500 without anyone pretending the cost disappeared.
Read the guide →
How to Price Your Supplement Product
Pricing a supplement starts with landed cost, not competitor guesswork. Build the number from formula, packaging, fill weight, MOQ and freight. Then add your margin and channel fees. This guide shows the inputs that move price most.
Read the guide →
Supplement Regulations by Country: What Brands Must Know
Selling supplements across borders means meeting different rules for notification, labelling, and ingredient limits. This guide covers the EU, US, UK, and Middle East, with practical notes for brands sourcing from a GMP-certified contract manufacturer.
Read the guide →Have a product in mind?
Send us the brief and we will come back with a formulation direction, indicative price and a realistic lead time — usually within one working day.